Disruption Arnhem C.-Nijmegen/Tiel

Level crossing failure
This disruption is resolved.
This disruption is from the older Rijden de Treinen archive and contains less information information than usual. For these older disruptions, there is unfortunately no translation available.

Tussen Arnhem C. en Kesteren/Nijmegen rijden minder treinen door een overwegstoring.
Houdt u rekening met een langere reistijd.
De verstoring is naar verwachting rond 9:30 uur verholpen.

Nov 12, 2016 6:37 AM

Affected lines

The following lines are affected by this disruption:

Information

This disruption started at 6:37 AM on November 12, 2016 and took 10 minutes in total.

For statistics, this disruption is caused due to a level crossing failure.