Disruption Arnhem-Winterswijk

Signal and level crossing failure
This disruption is resolved.
This disruption is from the older Rijden de Treinen archive and contains less information information than usual. For these older disruptions, there is unfortunately no translation available.

De beperkingen tussen Doetinchem en Winterswijk als gevolg van een sein- en overwegstoring zijn voorbij.
Het treinverkeer is volledig hervat.

Jan 31, 2011 11:05 PM

Affected lines

The following lines are affected by this disruption:

Information

This disruption started at 9:00 PM on January 31, 2011 and took 2 hours, 5 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.