Disruption Nijmegen-Oss

Damaged overhead wires
This disruption is resolved.
This disruption is from the older Rijden de Treinen archive and contains less information information than usual. For these older disruptions, there is unfortunately no translation available.

Tussen Nijmegen en Ravenstein rijden minder treinen door een defecte bovenleiding.
Houdt u rekening met een langere reistijd.
De verstoring is naar verwachting rond 12:00 uur verholpen.

Jan 15, 2015 11:00 AM

Affected lines

The following lines are affected by this disruption:

Information

This disruption started at 11:00 AM on January 15, 2015 and took 4 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.