Disruption cause: the construction of a tunnel

This page shows more information about this disruption cause.

This disruption cause has been categorized under Engineering works.

Recent service disruptions

Recent disruptions which are caused due to the construction of a tunnel. The three most recent service disruptions are shown.

the construction of a tunnel
Arnhem-Winterswijk
the construction of a tunnel
June 11, 2019, 6:04 PM - 6:05 PM • 2 minutes

View all disruptions caused due to the construction of a tunnel.

Most affected lines

List of the railway lines which are most often affected by this cause.

* One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.


Statistics

Statistics for this cause are calculated over the past 24 months.

Between May 1, 2022 and April 30, 2024, Rijden de Treinen has reported 0 disruptions caused due to the construction of a tunnel. On average (not set) disruptions per day.
The average duration for this cause is 0 seconds.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to the construction of a tunnel and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.