Disruption cause: repair works

This page shows more information about this disruption cause.

This disruption cause has been categorized under Engineering works.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Leiden Centraal - Schiphol Airport
    28 disruptions • duration: 4 days, 3 hours
  2. Amsterdam Centraal - Schiphol Airport
    20 disruptions • duration: 2 days, 14 hours
  3. Amsterdam Centraal - Utrecht Centraal
    19 disruptions • duration: 2 days, 21 hours
  4. Lelystad Centrum - Schiphol Airport
    19 disruptions • duration: 1 day, 19 hours
  5. Den Haag HS - Rotterdam Centraal
    17 disruptions • duration: 2 days, 9 hours

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between September 1, 2020 and August 31, 2022, Rijden de Treinen has reported 262 disruptions caused due to repair works. This is an average of 0 disruptions per day.

The average duration for this cause is 3 hours, 57 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to repair works and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.