Disruption cause: repair works

This page shows more information about this disruption cause.

This disruption cause has been categorized under Engineering works.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Breda - Dordrecht
    17 disruptions • duration: 1 day, 13 hours
  2. Leiden Centraal - Schiphol Airport
    16 disruptions • duration: 2 days
  3. Amsterdam Centraal - Schiphol Airport
    15 disruptions • duration: 1 day, 16 hours
  4. Lelystad Centrum - Schiphol Airport
    14 disruptions • duration: 20 hours, 37 minutes
  5. Schiphol Airport - Utrecht Centraal
    12 disruptions • duration: 21 hours, 1 minute

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between May 1, 2019 and April 30, 2021, Rijden de Treinen has reported 188 disruptions caused due to repair works. This is an average of 0 disruptions per day.

The average duration for this cause is 3 hours, 36 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to repair works and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.