Disruption cause: people along the railway

This page shows more information about this disruption cause.

This disruption cause has been categorized under External influences.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Nijmegen - Venlo
    1 disruption • duration: 38 minutes
  2. Eindhoven - Venlo
    1 disruption • duration: 38 minutes
  3. Groningen - Leer (Ostfriesland)
    1 disruption • duration: 31 minutes
  4. Dordrecht - Geldermalsen
    1 disruption • duration: 9 minutes
  5. Breda - Tilburg
    1 disruption • duration: 5 minutes

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between March 1, 2017 and February 28, 2019, Rijden de Treinen has reported 5 disruptions caused due to people along the railway. This is an average of 0 disruptions per day.

The average duration for this cause is 17 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to people along the railway and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.