Disruption cause: engineering works

This page shows more information about this disruption cause.

This disruption cause has been categorized under Engineering works.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Haarlem - Leiden Centraal
    2 disruptions • duration: 15 hours, 45 minutes
  2. Den Haag Centraal - Leiden Centraal
    2 disruptions • duration: 15 hours, 45 minutes
  3. Den Haag Centraal - Utrecht Centraal
    1 disruption • duration: 3 days, 12 hours
  4. Antwerpen-Centraal - Roosendaal
    1 disruption • duration: 1 day, 14 hours
  5. Amersfoort - Utrecht Centraal
    1 disruption • duration: 11 hours, 29 minutes

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between June 1, 2019 and May 31, 2021, Rijden de Treinen has reported 7 disruptions caused due to engineering works. This is an average of 0 disruptions per day.

The average duration for this cause is 21 hours, 58 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to engineering works and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.