Engineering works Amsterdam Centraal-Rotterdam Centraal Intercity direct

Engineering works
Engineering works are finished.
The information about engineering works is not translated. The original Dutch advice is shown below.

Travel advice

Period

zaterdag 18 en zondag 19 januari

Advice

U kunt gebruikmaken van de aangepaste dienstregeling

  • de dienstregeling is aangepast tussen Amsterdam Centraal, Schiphol Airport en Rotterdam Centraal via de HSL

Extra travel time

een kwartier

Dec 19, 2019 11:15 AM

Affected lines

The following lines are affected by these engineering works: