Engineering works Amsterdam Centraal-Utrecht Centraal

Engineering works
Engineering works are finished.
The information about engineering works is not translated. The original Dutch advice is shown below.

Travel advice

Period

vrijdag 30 augustus tot en met zondag 1 september

Advice

U kunt gebruikmaken van de overige treinen

  • er rijden minder Intercity's tussen Amsterdam Centraal en Utrecht Centraal

Extra travel time

geen extra reistijd

Aug 30, 2019 11:15 AM

Affected lines

The following lines are affected by these engineering works: