Engineering works: Schiphol - Utrecht
Situation
Between Schiphol Airport and Utrecht Centraal the timetable has been changed due to engineering works.
The additional travel time varies per journey.
Period
In the night from Thursday to Friday, November 27, 2026 between 1:00 AM and 5:00 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Schiphol Airport and Utrecht Centraal.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1400 Rotterdam C. - Utrecht C. is diverted and will not call at Amsterdam Centraal between Schiphol Airport and Utrecht Centraal
- Intercity 29600 Schiphol Airport - Amsterdam C. runs as extra service between Schiphol Airport and Amsterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, November 27, 2026 1:00 AM and Friday, November 27, 2026 5:00 AM.