Engineering works elsewhere: Rotterdam - Breda - Brussel
Situation
Between Rotterdam Centraal and Brussel Noord the international timetable has been changed due to engineering works elsewhere.
The additional travel time varies per journey.
Period
Between Saturday, November 28, 2026 5:00 AM hours and Monday, November 30, 2026 1:00 AM hours.
Advice
EuroCity is not running between Rotterdam C and Breda and is being diverted between Antwerpen C and Brussel Noord, without stopping at Mechelen.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Rotterdam Centraal and Brussel Noord.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
EuroCity
9200
Brussel Zuid - Rotterdam C.
- is cancelled between Rotterdam Centraal and Breda
- is diverted and will not call at Mechelen between Antwerpen Centraal and Brussel Noord
- is cancelled between Brussel Noord and Brussel Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, November 28, 2026 5:00 AM and Monday, November 30, 2026 1:00 AM.