Engineering works: Hoofddorp - Schiphol - Hilversum
Situation
Between Hoofddorp and Hilversum fewer Sprinter trains are running due to engineering works.
The additional travel time varies per journey.
Period
Between Saturday, November 21, 2026 9:00 AM hours and Sunday, November 22, 2026 9:00 PM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Hoofddorp and Hilversum.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5700 Utrecht C. - Leiden C. is cancelled between Hilversum and Hoofddorp
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, November 21, 2026 9:00 AM and Sunday, November 22, 2026 9:00 PM.