Engineering works: Amsterdam - Utrecht; Schiphol - Utrecht
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
Between Schiphol Airport and Utrecht Centraal the timetable has been changed due to engineering works.
The additional travel time varies per journey.
Period
Between Sunday, November 1, 2026 6:00 AM hours and Monday, November 2, 2026 1:00 AM hours.
Advice
Intercity trains between Amsterdam C and Utrecht, and between Schiphol Airport and Utrecht, are running less frequently and on an adjusted timetable. An additional transfer may be required.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Amsterdam Centraal and Utrecht Centraal and between Schiphol Airport and Utrecht Centraal.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2700 Zaandam - Maastricht runs today from/to Ede-Wageningen, Arnhem Centraal and Nijmegen between Alkmaar and Maastricht
- Intercity 2900 Enkhuizen - Maastricht runs today from/to Ede-Wageningen, Arnhem Centraal and Nijmegen between Amsterdam Centraal and Maastricht
- Intercity 3000 Den Helder - Nijmegen is cancelled between Den Helder and Alkmaar
-
Intercity
3100
Den Haag C. - Nijmegen
- is cancelled between Den Haag Centraal and Nijmegen
- runs as extra service between Utrecht Centraal and Maastricht
- Intercity 702900 Amsterdam C. - Enkhuizen runs as extra service between Enkhuizen and Amsterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, November 1, 2026 6:00 AM and Monday, November 2, 2026 1:00 AM.