engineering works

Engineering works: Eindhoven - Venlo

Situation

Between Helmond and Horst-Sevenum buses are running due to engineering works.
The additional travel time varies per journey.

Period

Between Thursday, October 29, 2026 9:00 PM hours and Monday, November 2, 2026 2:00 AM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Location of these engineering works

These engineering works take place between Helmond and Horst-Sevenum.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Thursday, October 29, 2026 9:00 PM to Saturday, October 31, 2026 2:00 AM
  • Saturday, October 31, 2026 4:00 AM to Monday, November 2, 2026 2:00 AM