engineering works

Engineering works: Lelystad Centrum - Rotterdam - Brussel

Situation

Between Lelystad Centrum and Brussel Zuid the international timetable has been changed due to engineering works.
The additional travel time varies per journey.

Period

Between Saturday, November 21, 2026 4:00 AM hours and Monday, November 23, 2026 2:00 AM hours.

Advice

Eurocity direct only runs between Amsterdam C and Antwerpen C via Rotterdam C. Other stops have been cancelled.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Location of these engineering works

These engineering works take place between Lelystad Centrum and Brussel Zuid.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, November 21, 2026 4:00 AM and Monday, November 23, 2026 2:00 AM.