Engineering works: Lelystad Centrum - Rotterdam - Brussel
Situation
Between Antwerpen Centraal and Brussel Zuid the international timetable has been changed due to engineering works.
The additional travel time varies per journey.
Period
Between Saturday, November 14, 2026 4:00 AM hours and Monday, November 16, 2026 2:00 AM hours.
Advice
Eurocity direct is not running between Antwerpen C and Brussel Zuid. EuroCity runs up to Brussel Noord.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Antwerpen Centraal and Brussel Zuid.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- EuroCity 9200 Brussel Zuid - Rotterdam C. does not call at Mechelen
- Eurocity Direct 9500 Brussel Zuid - Lelystad Centrum is cancelled between Antwerpen Centraal and Brussel Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, November 14, 2026 4:00 AM and Monday, November 16, 2026 2:00 AM.