Engineering works: Lelystad Centrum - Rotterdam - Brussel
Situation
Between Lelystad Centrum and Rotterdam Centraal the international timetable has been changed due to engineering works.
The additional travel time varies per journey.
Period
Between Saturday, September 12, 2026 5:00 AM hours and Monday, September 14, 2026 1:00 AM hours.
Advice
Eurocity direct does not operate between Lelystad C and Rotterdam C, but starts in Amsterdam C and runs non-stop to Rotterdam C and beyond.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Lelystad Centrum and Rotterdam Centraal.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Eurocity Direct
9500
Lelystad Centrum - Brussel Zuid
- is cancelled between Lelystad Centrum and Rotterdam Centraal
- runs as extra service between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
No lines are linked (yet) to these engineering works.
Time periods
These engineering works are in effect between Saturday, September 12, 2026 5:00 AM and Monday, September 14, 2026 1:00 AM.