Engineering works: Amsterdam - Köln - Frankfurt
Situation
Between Amsterdam Centraal and Utrecht Centraal the international timetable has been changed due to engineering works.
The additional travel time varies per journey.
Period
On Saturday, October 3, 2026 between 6:20 AM and 7:00 PM hours.
Advice
The ICE International is not running between Amsterdam Centraal and Utrecht Centraal.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Amsterdam Centraal and Utrecht Centraal.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- ICE 120 to 129 Frankfurt C. - Amsterdam C. is cancelled between Amsterdam Centraal and Utrecht Centraal
- ICE 220 to 229 München C. - Amsterdam C. is cancelled between Amsterdam Centraal and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, October 3, 2026 6:20 AM and Saturday, October 3, 2026 7:00 PM.