Engineering works: Venlo - Roermond
Situation
Between Venlo and Roermond buses are running due to engineering works.
The additional travel time varies per journey.
Period
Between Saturday, August 29, 2026 5:30 AM hours and Monday, August 31, 2026 1:35 AM hours.
Advice
Passengers between Venlo and Roermond travel via Eindhoven Centraal.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Venlo and Roermond.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Venlo, Tegelen, Reuver, Swalmen and Roermond.
- Stoptrein 32200 Boxmeer - Roermond is cancelled between Venlo and Roermond
- Express buses are running between Venlo, Reuver and Roermond.
- Express buses are running between Venlo, Reuver and Roermond.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, August 29, 2026 5:30 AM and Monday, August 31, 2026 1:35 AM.