engineering works

Engineering works: Arnhem - Zutphen

Situation

Between Arnhem Centraal and Zutphen buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Saturday, December 6, 2025 4:00 AM hours and Monday, December 8, 2025 2:00 AM hours.

Advice

Travel to/from Arnhem Velperpoort via Arnhem Centraal with Arriva or Breng.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Location of these engineering works

These engineering works take place between Arnhem Centraal and Zutphen.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, December 6, 2025 4:00 AM and Monday, December 8, 2025 2:00 AM.