engineering works

Engineering works: Heerlen - Aachen Hbf

Situation

Between Landgraaf and Aken buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Friday, November 21, 2025 9:50 PM hours and Saturday, November 22, 2025 1:15 AM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Location of these engineering works

These engineering works take place between Landgraaf and Aken.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, November 21, 2025 9:50 PM and Saturday, November 22, 2025 1:15 AM.