engineering works

Engineering works: Den Haag - Rotterdam; Gouda - Den Haag

Situation

Between Den Haag Ypenburg and Den Haag Centraal buses are running due to engineering works.
Between Den Haag Centraal and Den Haag HS no trains are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, September 27, 2025 4:00 AM hours and Monday, September 29, 2025 2:00 AM hours.

Advice

Passengers between Utrecht Centraal and Den Haag Centraal travel via Leiden Centraal. The extra travel time is unknown.
Passengers between Den Haag Centraal and Den Haag HS and Rotterdam Centraal travel via Den Haag Laan v NOI. The extra travel time is unknown.
Intercity trains from Utrecht C via Alphen a/d Rijn to Leiden C continue to Den Haag C.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 27, 2025 4:00 AM and Monday, September 29, 2025 2:00 AM.