engineering works

Engineering works: Hilversum - Amersfoort

Situation

Between Baarn and Amersfoort Centraal buses are running due to engineering works.
The extra travel time may be up to 15 minutes.

Period

Between Saturday, September 6, 2025 9:25 PM hours and Sunday, September 7, 2025 5:00 AM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, September 6, 2025 9:25 PM and Sunday, September 7, 2025 5:00 AM.