engineering works

Engineering works: Lelystad Centrum - Rotterdam - Brussel

Situation

Between Amsterdam Zuid and Rotterdam Centraal the international timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Saturday, September 20, 2025 5:00 AM hours and Sunday, September 21, 2025 10:50 PM hours.

Advice

Eurocity direct is not operating between Lelystad C /Amsterdam Zuid and Rotterdam C. Eurocity direct 9512 and 9516 will start from Amsterdam C.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, September 20, 2025 5:00 AM and Sunday, September 21, 2025 10:50 PM.