Engineering works: Utrecht - Amersfoort; Utrecht - Baarn
Situation
Between Utrecht Overvecht and Bilthoven buses are running due to engineering works.
The extra travel time is about 15 minutes.
Period
Between Saturday, August 30, 2025 7:35 PM hours and Monday, September 1, 2025 1:50 AM hours.
Advice
Passengers between Utrecht Centraal and Amersfoort Centraal travel via Hilversum. The extra travel time is unknown.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Overvecht and Bilthoven.
- Intercity 500 Den Haag C. - Groningen runs today from/to Amsterdam Centraal, Amsterdam Muiderpoort and Hilversum between Den Haag Centraal and Groningen
-
Intercity
600
Den Haag C. - Leeuwarden
- runs less often between Den Haag Centraal and Amersfoort Centraal
- is being diverted and will make an extra call at Hilversum between Den Haag Centraal and Leeuwarden
- has a changed schedule between Amsterdam Centraal and Amersfoort Centraal
- Intercity 1700 Den Haag C. - Enschede runs today from/to Hilversum, Amsterdam Zuid and Schiphol Airport between Enschede and Den Haag Centraal
- Sprinter 5500 Utrecht C. - Baarn is cancelled between Utrecht Overvecht and Bilthoven
- Sprinter 5600 Utrecht C. - Zwolle is cancelled between Utrecht Overvecht and Bilthoven
-
Intercity
701700
Utrecht C. - Den Haag C.
- runs as extra service between Den Haag Centraal and Utrecht Centraal
- will make an extra stop at Woerden
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, August 30, 2025 7:35 PM and Monday, September 1, 2025 1:50 AM.