Engineering works: Groningen - Bad Nieuweschans
Situation
Between Zuidbroek and Bad Nieuweschans buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, August 11, 2025 5:00 AM hours and Saturday, August 23, 2025 1:10 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Zuidbroek, Scheemda, Winschoten and Bad Nieuweschans.
- Stoptrein 37500 Europapark - Bad Nieuweschans is cancelled between Groningen and Bad Nieuweschans
- Sneltrein 37900 Groningen - Winschoten is cancelled between Groningen and Winschoten
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, August 11, 2025 5:00 AM and Saturday, August 23, 2025 1:10 AM.