Repair works: Utrecht - Rotterdam; Utrecht - Den Haag; Breukelen - Gouda
Situation
Between Gouda Goverwelle and Woerden far fewer trains are running due to repair works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, July 7, 2025 7:30 PM hours and Tuesday, July 8, 2025 12:45 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 500 Den Haag C. - Europapark is cancelled between Utrecht Centraal and Den Haag Centraal
- Intercity 600 Den Haag C. - Leeuwarden is cancelled between Utrecht Centraal and Gouda
- Intercity 1700 Den Haag C. - Enschede is cancelled between Utrecht Centraal and Den Haag Centraal
- Intercity 2000 Rotterdam C. - Utrecht C. is cancelled between Utrecht Centraal and Rotterdam Centraal
- Intercity 2800 Rotterdam C. - Utrecht C. is cancelled between Utrecht Centraal and Gouda
- Sprinter 4000 Zaandam - Rotterdam C. is cancelled between Woerden and Gouda Goverwelle
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, July 7, 2025 7:30 PM and Tuesday, July 8, 2025 12:45 AM.