engineering works

Engineering works: Utrecht - Amersfoort; Utrecht - Baarn

Situation

Between Utrecht Overvecht and Baarn buses are running due to engineering works.
Between Utrecht Overvecht and Amersfoort Centraal buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Saturday, July 19, 2025 1:00 PM hours and Sunday, July 20, 2025 3:25 AM hours.

Advice

Passengers between Utrecht Centraal and Amersfoort Centraal and Baarn travel via Hilversum. The extra travel time is unknown.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, July 19, 2025 1:00 PM and Sunday, July 20, 2025 3:25 AM.