Engineering works: Utrecht - Amersfoort; Utrecht - Baarn
Situation
Between Utrecht Overvecht and Baarn buses are running due to engineering works.
Between Utrecht Overvecht and Amersfoort Centraal buses are running due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, July 19, 2025 1:00 PM hours and Sunday, July 20, 2025 3:25 AM hours.
Advice
Passengers between Utrecht Centraal and Amersfoort Centraal and Baarn travel via Hilversum. The extra travel time is unknown.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Utrecht Overvecht, Bilthoven, Den Dolder, Soest Zuid, Soest, Soestdijk, Baarn and Amersfoort Centraal.
- Intercity 500 Den Haag C. - Europapark is cancelled between Utrecht Centraal and Assen
- Intercity 600 Den Haag C. - Leeuwarden is cancelled between Utrecht Centraal and Leeuwarden
- Intercity 1700 Den Haag C. - Enschede is cancelled between Utrecht Centraal and Amersfoort Centraal
- Sprinter 5500 Utrecht C. - Baarn is cancelled between Utrecht Centraal and Baarn
- Sprinter 5600 Utrecht C. - Zwolle is being diverted and will make an extra call at Hilversum between Utrecht Overvecht and Amersfoort Centraal
- Sprinter 5700 Hilversum - Utrecht C. runs twice per hour between Utrecht Centraal and Hoofddorp
- Intercity 21400 Amersfoort C. - Utrecht C. is cancelled between Utrecht Centraal and Amersfoort Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 19, 2025 1:00 PM and Sunday, July 20, 2025 3:25 AM.