engineering works

Engineering works: Lelystad Centrum - Rotterdam - Brussel; Rotterdam - Breda - Brussel

Situation

Between Lelystad Centrum and Almere Centrum the international timetable has been changed due to engineering works.
Between Breda and Noorderkempen buses are running due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Saturday, August 23, 2025 6:00 AM hours and Sunday, August 24, 2025 11:50 PM hours.

Advice

Eurocity direct does not run between Lelystad C and Almere C. Buses are running between Breda and Noorderkempen.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between:

  • Saturday, August 23, 2025 6:00 AM to Saturday, August 23, 2025 11:50 PM
  • Sunday, August 24, 2025 6:00 AM to Sunday, August 24, 2025 11:50 PM