staffing problems

Staffing problems: Heerlen - Aachen Hbf

Situation

Between Heerlen and Aken fewer express trains are running due to a staff shortage.

Period

On Friday, June 27, 2025 between 5:00 AM and 12:30 PM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, June 27, 2025 5:00 AM and Friday, June 27, 2025 12:30 PM.