Engineering works elsewhere: Amsterdam - Schiphol - Hoofddorp
Situation
Between Amsterdam Centraal and Schiphol Airport fewer Sprinter trains are running due to engineering works elsewhere.
The extra travel time is more than 15 minutes.
Period
Between Monday, July 7, 2025 5:00 AM hours and Monday, July 14, 2025 3:00 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity direct
2400
Schiphol Airport - Lelystad C.
- is cancelled between Schiphol Airport and Lelystad Centrum
- runs today from/to Amsterdam Centraal between Rotterdam Centraal and Amsterdam Centraal
- Sprinter 8100 Hoofddorp - Amsterdam C. is cancelled between Amsterdam Centraal and Hoofddorp
- Sprinter 8200 Hoofddorp - Amsterdam C. is cancelled between Amsterdam Centraal and Hoofddorp
- Sprinter 8300 Hoofddorp - Amsterdam C. is cancelled between Amsterdam Centraal and Hoofddorp
- Sprinter 8400 Hoofddorp - Amsterdam C. is cancelled between Amsterdam Centraal and Hoofddorp
- Sprinter 18100 Amsterdam C. - Hoofddorp runs as extra service between Amsterdam Centraal and Hoofddorp
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, July 7, 2025 5:00 AM and Monday, July 14, 2025 3:00 AM.