engineering works

Engineering works: Utrecht - Rotterdam; Utrecht - Den Haag

Situation

Between Utrecht Centraal and Rotterdam Centraal buses are running due to engineering works.
Between Den Haag Centraal and Utrecht Centraal buses are running due to engineering works.
The extra travel time is between 30 and 45 minutes.

Period

In the night from Friday to Saturday, June 28, 2025 between 1:00 AM and 2:40 AM hours.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, June 28, 2025 1:00 AM and Saturday, June 28, 2025 2:40 AM.