Engineering works: Schiphol - Rotterdam
Situation
Between Schiphol Airport and Rotterdam Centraal no trains are running on the high-speed line due to engineering works.
Period
Between Saturday, June 28, 2025 1:00 AM hours and Monday, June 30, 2025 5:15 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 1800 Schothorst - Breda is cancelled between Rotterdam Centraal and Amersfoort Schothorst
- Intercity direct 2400 Lelystad C. - Rotterdam C. is cancelled between Rotterdam Centraal and Amsterdam Zuid
- Eurocity Direct 9500 Lelystad C. - Brussel-Zuid is cancelled between Brussel-Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 28, 2025 1:00 AM and Monday, June 30, 2025 5:15 AM.