engineering works

Engineering works: Amsterdam - Hannover - Berlin

Situation

Between Berlin Hbf and Amsterdam Centraal the international timetable has been changed due to engineering works.
There is no additional travel time..

Period

On Sunday, August 24, 2025 between 8:00 AM and 9:49 AM hours.

Advice

IC Berlijn 242 is not running.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Sunday, August 24, 2025 8:00 AM and Sunday, August 24, 2025 9:49 AM.