Engineering works: Schiphol - Lelystad; Schiphol - Amersfoort; Schiphol - Utrecht
Situation
Between Schiphol Airport and Amsterdam RAI no trains are running due to engineering works.
The extra travel time is about 30 minutes.
Period
Between Saturday, June 14, 2025 1:00 AM hours and Monday, June 16, 2025 3:00 AM hours.
Advice
Your NS travel ticket is valid on the metro between Amsterdam RAI, Amsterdam Zuid, and Amsterdam Lelylaan. Through travelers can travel via Amsterdam C.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Use the Amsterdam metro system between Amsterdam RAI, Amsterdam Zuid and Amsterdam Lelylaan.
-
Intercity
700
Schiphol Airport - Europapark
- is cancelled between Almere Centrum and Schiphol Airport
- runs today from/to Amsterdam Centraal between Almere Centrum and Amsterdam Centraal
- will make an extra stop at Weesp
-
Intercity
800
Schiphol Airport - Leeuwarden
- is cancelled between Almere Centrum and Schiphol Airport
- runs today from/to Amsterdam Centraal between Almere Centrum and Amsterdam Centraal
- will make an extra stop at Weesp
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 14, 2025 1:00 AM and Monday, June 16, 2025 3:00 AM.