Engineering works: 's-Hertogenbosch - Eindhoven
Situation
Between Boxtel and Eindhoven Centraal the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, May 31, 2025 2:15 AM hours and Monday, June 2, 2025 2:00 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
2900
Maastricht - Enkhuizen
- is cancelled between Boxtel and Maastricht
- will make an extra stop at Vught
-
Intercity
3500
Venlo - Dordrecht
- is cancelled between Eindhoven Centraal and Venlo
- runs as extra service between Eindhoven Centraal and Maastricht
- Sprinter 4400 Deurne - Oss is cancelled between 's-Hertogenbosch and Eindhoven Centraal
- Intercity 28500 Eindhoven C. - Venlo runs as extra service between Eindhoven Centraal and Venlo
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, May 31, 2025 2:15 AM and Monday, June 2, 2025 2:00 AM.