Engineering works: Nijmegen - Venlo
Situation
Between Mook-Molenhoek and Venlo buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, May 31, 2025 4:00 AM hours and Monday, June 2, 2025 2:00 AM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Mook-Molenhoek, Cuijk, Boxmeer, Vierlingsbeek, Venray, Blerick and Venlo.
- Express buses are running between Mook-Molenhoek, Boxmeer and Venray.
- Stoptrein 32200 Nijmegen - Roermond is cancelled between Mook-Molenhoek and Venlo
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, May 31, 2025 4:00 AM and Monday, June 2, 2025 2:00 AM.