Engineering works: Enschede - Gronau - Dortmund
Situation
Between Lette (Kr Coesfeld) and Lüdinghausen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, May 24, 2025 5:50 AM hours and Wednesday, June 11, 2025 11:59 PM hours.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Lette (Kr Coesfeld), Dülmen and Lüdinghausen.
- Stoptrein 20200 to 20249 Lette (Kr Coes) - Lüdinghausen is cancelled between Lette (Kr Coesfeld) and Lüdinghausen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, May 24, 2025 5:50 AM and Wednesday, June 11, 2025 11:59 PM.