engineering works

Engineering works: Schiphol - Lelystad; Schiphol - Amersfoort; Schiphol - Utrecht; Amsterdam - Schiphol; Amsterdam...

Situation

Between Schiphol Airport and Amsterdam RAI no trains are running due to engineering works.
Between Amsterdam Centraal and Schiphol Airport the timetable has been changed due to engineering works.
The extra travel time is between {time_min} minutes.

Period

Between Thursday, May 29, 2025 1:00 AM hours and Monday, June 2, 2025 5:00 AM hours.

Advice

Your NS travel ticket is valid on metro 51 between Amsterdam RAI, Amsterdam Zuid, and Amsterdam Lelylaan. Travelers continuing their journey travel via Amsterdam C.

The timetable has been modified. You can see the modified timetable on this page.

Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Thursday, May 29, 2025 1:00 AM and Monday, June 2, 2025 5:00 AM.