Engineering works: Utrecht - 's-Hertogenbosch; Utrecht - Tiel
Situation
Between Houten Castellum and 's-Hertogenbosch buses are running due to engineering works.
Between Houten Castellum and Tiel buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, May 3, 2025 1:17 AM hours and Monday, May 5, 2025 2:00 AM hours.
Advice
There are no Intercity trains running between Utrecht Centraal and 's-Hertogenbosch. Please use the express bus.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Houten, Culemborg, Geldermalsen, Tiel Passewaaij and Tiel.
- Local buses are running between Houten, Culemborg, Geldermalsen, Zaltbommel and 's-Hertogenbosch.
- Express buses are running between Utrecht Centraal and 's-Hertogenbosch.
- Intercity 2900 Maastricht - Enkhuizen is cancelled between Utrecht Centraal and 's-Hertogenbosch
- Intercity 3500 Venlo - Dordrecht is cancelled between Utrecht Centraal and 's-Hertogenbosch
- Sprinter 6000 's-Hertogenbosch - Den Haag C. is cancelled between Houten Castellum and 's-Hertogenbosch
- Sprinter 6700 Tiel - Leiden C. is cancelled between Houten Castellum and Tiel
- Express buses are running between 's-Hertogenbosch and Utrecht Centraal.
- Intercity 21400 Utrecht C. - 's-Hertogenbosch is cancelled between Utrecht Centraal and 's-Hertogenbosch
- Express buses are running between 's-Hertogenbosch and Utrecht Centraal.
- Intercity 21400 Utrecht C. - 's-Hertogenbosch is cancelled between Utrecht Centraal and 's-Hertogenbosch
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, May 3, 2025 1:17 AM and Monday, May 5, 2025 2:00 AM.