engineering works HSL

Engineering works on the high-speed line: Rotterdam - Breda; Den Haag - Rotterdam - Dordrecht;...

Situation

Between Schiphol Airport and Rotterdam Centraal fewer Intercity Direct trains are running due to engineering works on the high-speed line.
Between Rotterdam Centraal and Breda no trains are running on the high-speed line due to engineering works on the high-speed line.
Between Den Haag Centraal and Dordrecht the timetable has been changed due to engineering works on the high-speed line.
The extra travel time is between 15 and 30 minutes.

Period

Between Saturday, September 7, 2024 4:00 AM hours and Monday, September 9, 2024 2:00 AM hours.

Advice

Passengers between Rotterdam Centraal and Breda travel via Dordrecht.

Last update:

Location of these engineering works

These engineering works take place between Schiphol Airport and Rotterdam Centraal and between Rotterdam Centraal and Breda and between Den Haag Centraal and Dordrecht.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Saturday, September 7, 2024 4:00 AM and Monday, September 9, 2024 2:00 AM.