bouw viaduct

De bouw van een viaduct: Amersfoort - Zwolle; Zwolle - Groningen; Lelystad - Zwolle; Zwolle...

Situation

Between Kampen Zuid and Zwolle buses are running door de bouw van een viaduct.
Between 't Harde and Zwolle buses are running door de bouw van een viaduct.
The extra travel time is about 30 minutes.

Period

Between Monday, April 29, 2024 4:00 AM hours and Friday, May 3, 2024 2:00 AM hours.

Advice

Vanaf Zwolle is er ook businzet naar Kampen.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Monday, April 29, 2024 4:00 AM to Thursday, May 2, 2024 2:00 AM
  • Thursday, May 2, 2024 4:00 AM to Friday, May 3, 2024 2:00 AM