engineering works

Engineering works: Utrecht - Zwolle; Utrecht - Baarn

Situation

Between Bilthoven and Amersfoort Centraal buses are running due to engineering works.
Between Bilthoven and Baarn buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

Between Saturday, March 9, 2024 12:45 PM hours and Sunday, March 10, 2024 3:20 AM hours.

Advice

Passengers between Utrecht Centraal and Amersfoort Centraal travel via Hilversum.

Last update:

Location of these engineering works

These engineering works take place between Bilthoven and Amersfoort Centraal and between Bilthoven and Baarn.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, March 9, 2024 12:45 PM and Sunday, March 10, 2024 3:20 AM.