engineering works

Engineering works: Utrecht - Rhenen

Situation

Between Utrecht Centraal and Rhenen buses are running due to engineering works.
The extra travel time is more than 45 minutes.

Period

Between Saturday, January 27, 2024 11:45 PM hours and Sunday, January 28, 2024 1:45 AM hours.

Last update:

Location of these engineering works

These engineering works take place between Utrecht Centraal and Rhenen.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, January 27, 2024 10:35 PM and Sunday, January 28, 2024 1:45 AM.