Engineering works: Amsterdam - Rotterdam - Brussel
Current status:
Engineering works are finished.
Situation
Between Amsterdam Centraal and Rotterdam Centraal the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, March 9, 2024 4:00 AM hours and Monday, March 11, 2024 2:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 9200 to 9211 Amsterdam C./Brussel-Z. Midi - Brussel-Z. Midi/Amsterdam C. is diverted and will not call at Schiphol Airport between Amsterdam Centraal and Brussel-Zuid Midi
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, March 9, 2024 4:00 AM and Monday, March 11, 2024 2:00 AM.