engineering works

Engineering works: Utrecht - Breukelen; Utrecht - Rhenen

Situation

Between Utrecht Zuilen and Utrecht Centraal the timetable has been changed due to engineering works.
Between Utrecht Vaartsche Rijn and Bunnik the timetable has been changed due to engineering works.
There is no additional travel time..

Period

On Sunday, October 23, 2022 between 11:20 AM and 4:20 PM hours.

Advice

Passengers from Utrecht Zuilen towards Utrecht Centraal travel via Maarssen.
Passengers from Utrecht Vaartsche Rijn towards Bunnik and Driebergen-Zeist travel via Utrecht Centraal.

Last update:

Location of these engineering works

These engineering works take place between Utrecht Zuilen and Utrecht Centraal and between Utrecht Vaartsche Rijn and Bunnik.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Time periods

These engineering works are in effect between Sunday, October 23, 2022 11:20 AM and Sunday, October 23, 2022 4:20 PM.