engineering works

Engineering works: Eindhoven - Venlo

Situation

Between Eindhoven Centraal and Venlo buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Sunday, October 23, 2022 4:00 AM hours and Wednesday, November 2, 2022 2:00 AM hours.

Advice

Passengers between Eindhoven Centraal and Horst-Sevenum and Blerick travel via Helmond.
Passengers between Eindhoven Centraal and Helmond Brandevoort and Helmond 't Hout travel via Helmond.
Passengers between Eindhoven Centraal and Helmond Brouwhuis travel via Helmond.

Last update:

Location of these engineering works

These engineering works take place between Eindhoven Centraal and Venlo.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, October 23, 2022 4:00 AM and Wednesday, November 2, 2022 2:00 AM.