engineering works

Engineering works: Amersfoort - Ede-Wageningen

Situation

Between Barneveld Centrum and Ede-Wageningen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, October 1, 2022 4:00 AM hours and Monday, October 3, 2022 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, October 1, 2022 4:00 AM and Monday, October 3, 2022 2:00 AM.