Engineering works: Amsterdam - Utrecht; Utrecht - Rhenen
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed and the Intercity's remain running due to engineering works.
Between Driebergen-Zeist and Rhenen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, July 17, 2022 4:00 AM hours and Monday, July 18, 2022 2:00 AM hours.
Advice
Passengers between Utrecht Zuilen and Bunnik and Driebergen-Zeist travel via Utrecht Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Utrecht Centraal, Bunnik, Driebergen-Zeist, Maarn, Veenendaal West, Veenendaal Centrum and Rhenen.
- Intercity 3000 Den Helder - Amsterdam C. - Utrecht C. - Nijmegen keeps running normally between Den Helder and Nijmegen
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen keeps running normally between Schiphol Airport and Nijmegen
- Sprinter 7300 Breukelen - Utrecht C. - Rhenen is cancelled between Breukelen and Rhenen
- Sprinter 7400 Uitgeest - Amsterdam C. - Utrecht C. - Driebergen-Zeist is cancelled between Amsterdam Centraal and Driebergen-Zeist
- Intercity 700800 Alkmaar - Utrecht C. will make an extra stop at Breukelen, Maarssen and Utrecht Zuilen
- Intercity 702900 Enkhuizen - Utrecht C. will make an extra stop at Breukelen, Maarssen and Utrecht Zuilen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, July 17, 2022 4:00 AM and Monday, July 18, 2022 2:00 AM.