Engineering works: Amsterdam - Schiphol - Rotterdam (HSL)
Current status:
Engineering works are finished.
Situation
Between Amsterdam Centraal and Schiphol Airport the timetable has been changed due to engineering works.
You have no extra travel time.
Period
In the night from Friday to Saturday, June 25, 2022 between 5:45 AM and 6:15 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Amsterdam Centraal and Schiphol Airport (only in direction of Schiphol Airport)
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. is cancelled between Amsterdam Centraal and Schiphol Airport (only in direction of Schiphol Airport)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, June 25, 2022 5:45 AM and Saturday, June 25, 2022 6:15 AM.